Ecology Calculation Methodology – Route 1 (GN35)

Download document

Guidance Note 35 outlines the methodology to be adopted by Route 1 assessments for each of the core assessment issues relating to ecology in the BREEAM UK New Construction 2018 scheme. It forms a part of that scheme’s technical manual, which means the methodology and process described are an integral part of the scheme assessment criteria.

Current version: v0.1, published September 2018