Western Power Distribution Unit, Llandrindod Wells Powys, UK

ABOUT THE BUILDING The Western Power Distribution unit incorporates a production area and associated office accommodation. It is a steel frame building located on the Dole Industrial Estate, north of Llandrindod Wells in Powys.

Western Power Distribution, Spilsby

WESTERN POWER DISTRIBUTION’S NEW 650M2 DEPOT IN SPILSBY, LINCOLNSHIRE HAS ACHIEVED A FINAL POST-CONSTRUCTION STAGE BREEAM OUTSTANDING RATING. The new Western Power Distribution depot at Spilsby incorporates a warehouse area and associated office and ancillary accommodation and has achieved a world-first final BREEAM score of 100%, which includes a maximum 10 out of 10 score … Continue reading “Western Power Distribution, Spilsby”

Vrangelsro, Sweden

The first BREEAM Europe 2008 Industrial assessment in Sweden has been certified. The development, ‘Vrangelsro 5.3,’ is located in the southern city of Halmstad, on the west coast, and achieved a ‘Pass’ rating at the post-construction assessment stage. It is the second project in Sweden to achieve BREEAM certification.

VLA Stores Building, Weybridge, UK

ABOUT THE BUILDING A new two-storey Stores Building is replacing existing accommodation on the Veterinary Laboratories Agency (VLA) campus near Weybridge. It has primary storage and goods-in and -out areas located on the ground floor, for reasons of structural loading and accessibility, with the lighter loads of the box stores, office, lockers and rest room … Continue reading “VLA Stores Building, Weybridge, UK”

Foresterhill Energy Centre

ABOUT THE BUILDING NHS Grampian’s new Energy Centre was commissioned to serve the current and future energy requirements of the Foresterhill Health Campus, and in response to: failing and insecure current energy production facilities, with boiler plant nearing the end of its economic life and high associated labour costs increased energy requirements associated with recent … Continue reading “Foresterhill Energy Centre”

PointPark Poznan Building 5, Poland

ABOUT THE BUILDING A warehouse building in the PointPark Poznan Logistics Centre has been awarded an Interim BREEAM ‘Very Good’ rating. The park is managed by PointPark Properties (P3), a leading pan-European asset manager and developer of warehouse properties. The park currently consists of three buildings totalling 63,300m2, and has the potential to extend to … Continue reading “PointPark Poznan Building 5, Poland”

Costco Warehouse, Croydon, UK

ABOUT THE BUILDING The building will be owned and operated by Costco Wholesale UK Limited as a cash and carry membership warehouse. The total floor area of the warehouse building is 12,975 m2. The development is self-contained and located off Imperial Way, on the Croydon Airport Industrial Estate. BREEAM certification was carried out as requested … Continue reading “Costco Warehouse, Croydon, UK”